Chapter 11.2 Water Part 11.2.1 Approving the United States Bureau of Reclamation to Perform River Maintenance within the Rio Grande River §§ 11.2.1.010 – 11.2.1.030 Part 11.2.2 Act Approving the Revised Settlement Agreement Dated April 19, 2012, the Cost-Sharing and System Integration Agreement, and Waivers and Releases of Some Claims in the Water Rights Adjudication, State v. Aamodt. §§ 11.2.2.010 – 11.2.2.030 Part 11.2.3 Act Authorizing Evaluation and Negotiation of Subsequent Agreements and Documents in State v. Aamodt. §§ 11.2.3.010 – 11.2.3.040 Part 11.2.4 Granting the Bureau of Reclamation and Its Contactors Permission to Survey Within the Exterior Boundaries of the Land Owned by the Pueblo de San Ildefonso In Order to Plan and Design the Pojoaque Basin Regional Water System as Authorized by the Aamodt Litigation Settlement Act – Public Law 111-291 Title VI, Enacted December 8, 2010. §§ 11.2.4.010 – 11.2.4.040 Part 11.2.5 Selection of Preferred Option 9 for River Diversion and Treatment Plant Location For Regional Water System as Part of the Settlement of the Water Rights Adjudication State v. Aamodt. §§ 11.2.5.010 – 11.2.5.030 Part 11.2.6 Support for Indian Health Services to Conduct an Environmental Assessment and Geotechnical Investigation for the Water Main to Pajarito; and Planning and Design of the New Black Mesa Pumphouse Near the Newly Drilled Black Mesa Well #2, Water Main Extension from Black Mesa Well #1 to the New Pumphouse, Water Main Extension From the Pumphouse to Water System, New Solenoid Valve, Water System Controls, Booster Station, and Water Main Extension from Booster Station to Pajarito Existing Water System, Which will Include Boring Under the Rio Grande. §§ 11.2.6.010 – 11.2.6.020 Part 11.2.7 An Act Approving Memorandum of Agreement (MOA) Between the Bureau of Reclamation and the Pueblo de San Ildefonso to Facilitate Pueblo de San Ildefonso Involvement in the Planning, Design and Construction of the Pojoaque Basin Regional Water System as Part of the Water Rights Settlement in the Aamodt Case. §§ 11.2.7.010 – 11.2.7.030 Part 11.2.8 An Act Approving Economic Development Water Agreement As Part of Water Rights Settlement in Aamodt Case. §§ 11.2.8.010 – 11.2.8.030 Part 11.2.9 Act Approving Amending Pueblo Economic Development Water Agreement As Part of Water Rights Settlement in Aamodt Case. §§ 11.2.9.010 – 11.2.9.020 Part 11.2.10 Approval for Bureau of Reclamation and Its Contractors to (1) Perform the Pilot Water Treatment Plant Study and Horizontal Collector Well Study for the Regional Water System, and (2) Establish Priority for Surveying Lands within Pueblo boundaries As Part of the Settlement of the Water Rights Adjudication, State v. Aamodt §§ 11.2.10.010 – 11.2.10.030 Part 11.2.11 Act Authorizing the Withdraw of Aamodt Water Settlement Trust Funds From the Office of Special Trustee to Fund Aamodt Settlement Implementation Activities Request by Pueblo in Coordination with Regional Water System Work §§ 11.2.11.010 – 11.2.11.020 Part 11.2.12 Approving Water Uses by U.S. Bureau of Reclamation Connected with Work Developing Regional Water System as Part of the Settlement of the Water Rights Adjudication, State v. Aamodt. §§ 11.2.12.010 – 11.2.12.030 Part 11.2.13 Act Authorizing the Withdraw of $976,000 of Aamodt Water Settlement Trust Funds From the Office of Special Trustee to Fund Aamodt Settlement Implementation Activities Request by Pueblo in Coordination with Regional Water System Work. §§ 11.2.13.010 – 11.2.13.020 Part 11.2.14 Act Authorizing Third Withdrawal Of Aamodt Water Settlement Trust Funds From The Office Of Special Trustee To Fund Aamodt Settlement Implementation Activities Requested By Pueblo In Coordination With Regional Water System Work. §§ 11.2.14.010 – 11.2.14.040 Part 11.2.15 Acceptance Of Preliminary Engineering Report For Wastewater System Improvements For The Pueblo De San Ildefonso §§ 11.2.15.010 – 11.2.15.030 Part 11.2.16 Act To Withdraw Challenges Filed In 1983 To Non-Indian Water Rights, And Waiving The Right To File Any Additional Challenges To Non-Indian Water Rights In The Aamodt Case §§ 11.2.16.010 – 11.2.16.060 Part 11.2.17 Act Authorizing Signature Of Joint Powers Agreement As Part Of Aamodt Water Rights Settlement §§ 11.2.17.010 – 11.2.17.060 Part 11.2.18 Act Authorizing Location Of Water Treatment Plant As Part Of Aamodt Water Rights Settlement §§ 11.2.18.010 – 11.2.18.060 Part 11.2.20 Act Authorizing the Bureau of Reclamation and its Contractors to Perform the Pilot Water Treatment Plant Testing Plan §§ 11.2.20.010 – 11.2.20.040 Part 11.2.21 Act Authorizing Fourth Withdrawal of Aamodt Water Settlement Trust Funds from the Office of Special Trustee to Fund Aamodt Settlement Implementation Activities Requested by Pueblo in Coordination with Regional Water System Work §§ 11.2.21.010 – 11.2.21.020 Part 11.2.22 Act Authorizing Sixth Withdrawal of Aamodt Water Settlement Trust Funds from the Office of Special Trustee to Fund Aamodt Settlement Implementation Activities Requested by Pueblo in Coordination with Regional Water System Work §§ 11.2.22.010 – 11.2.22.020 Part 11.2.23 Act Accepting the 90% Design for Phase 1 of the Pojoaque Basin Regional Water System §§ 11.2.23.010 – 11.2.23.040 Part 11.2.24 Act Authorizing Signature of Agreement Pursuant to Section 611(g) of Title IV of the Claims Resolution Act of 2010 Relating to the Aamodt Water Settlement §§ 11.2.24.010 – 11.2.24.040 Part 11.2.25 Act Authorizing Signature of Pojoaque Basin Regional Water System Project Construction Agreement §§ 11.2.25.010 – 11.2.25.040 Part 11.2.26 Act Authorizing Signature of Pojoaque Basin Regional Water System Project Construction Agreement with Amended Exhibit A §§ 11.2.26.010 – 11.2.26.040 Part 11.2.27 Act Authorizing Signature of Amended Cost-Sharing and System Integration Agreement §§ 11.2.27.010 – 11.2.27.040